B2. Hybrid Hauling
Edge Mesh prototype over heterogeneous links
Explore documentation of the B2 milestone for the Florete project.
Scope
Scope of the B2 milestone "Hybrid Hauling"
Design Sketch
How B2's pieces fit together — the full picture before the details
Link Contract
What Florete requires from an underlying L1/L2 medium
Radio MACs
MAC families, RRA placement, and evolution toward advanced radio setups
Time Sync
Two clock domains — the slot clock and the network clock — and the R8 bridge between them
Slot Clock
Slot synchronization for scheduled MACs without fixed infrastructure
Network Clock
Rete time — Coordinator-referenced, agent-disciplined, bounded like any ctrl decision
Experiments
Falsifiable experiments that turn link-contract assertions into numbers
Attachment Labels
Note: why PoA labels stop at the medium and never climb the recursion
Glossary
Terms and acronyms introduced by the B2 milestone